WhatsApp: +86 15302103551
E-mail:
info@hopexformingline.com
Tel:+86 022 86728681
Fax:+86 022 86728681

Develivery time:25-35 days
Payment:30% T/T deposit,70% balance before shipping
Warranty :2 years for machinery warranty
WhatsApp: 008615302103551
E-mail: Jay@haixingsteel.com
Sheet Metal Leveling Machine | HOPEX 1220 Cut Length
Order the metal leveling machine with a coil car for fast loading. The sheet leveling machine comes with an optical sensor for precise strip tracking. The sheet metal leveling machine control panel is bilingual. The steel leveling machine adds a digital thickness readout, and every unit includes one-year spare parts.

Sheet leveling machine
Detail


Metal leveling machine
|
No.
|
sheet leveling machine
|
|
|
1
|
Product name | sheet metal leveling machine |
|
2
|
Equipment footprint | 2500*1600*1750mm |
|
3
|
Feed width | widest 1220mm |
|
4
|
Feed thickness | 1mm |
|
5
|
Material of raw materials | color coated coil |
|
6
|
Online punching, production speed | 10-15 meters/minute. |
|
7
|
Number of Rows | 5mm top, 6mm bottom |
|
8
|
Main Motor Power | 5.5kw |
|
9
|
Voltage | 220V, 3-phase |



Q: 1. How do I adjust the machine for different widths and heights?
For standard lines, it can be adjusted via high-precision manual spacers. However, for our premium series (like the HOPEXcustomized lines), we integrate an automatic motorized width-adjustment system controlled entirely through the PLC touchscreen, moving the forming rollers smoothly to your desired dimensions within seconds.
Q: 2. Is the width adjustment manual or fully automatic via PLC?
We offer both options based on your budget. Our advanced cable tray and housing profile lines feature fully automatic PLC one-key changeover. The operator simply inputs the parameters on the screen, and the machine adjusts itself automatically, eliminating human error.
3. How long does a standard size/profile changeover take?
With our traditional manual adjustment lines, it takes about 1-2 hours. With our upgraded Smart PLC One-Key Changeover System, a complete width adjustment (e.g., from 100mm to 600mm for cable trays) takes less than 2 minutes, drastically reducing your downtime and boosting factory productivity.